Notice: file_get_contents(): read of 8192 bytes failed with errno=21 Is a directory in /home/darkwolf/gtei.darkwolfdesign.co.uk/wp-includes/functions.php on line 4681
Notice: wp_json_file_decode(): Error when decoding a JSON file at path /home/darkwolf/gtei.darkwolfdesign.co.uk/wp-content/themes/gtei/resources: Syntax error in /home/darkwolf/gtei.darkwolfdesign.co.uk/wp-includes/functions.php on line 6131
A number of stress analyses were required to evaluate the structural integrity of a Waste Heat Recovery Unit (WHRU) designed by TEi Limited (TEi) for a Floating Production Storage & Offloading Vessel (FPSO).
The unit was designed to fit the configuration of an existing vessel, hence the eccentric shape of the unit, which brought about a number of design and construction challenges.








